INCOMING INSPECTION & PRELIMINARY VACUUM
INVESTIGATION
|
Incoming Vacuum Reading |
 |
Break Vacuum, on VJ Lines |
Break Vacuum on main vessel |
Replace o-ring on lift plate |
VJ Vacuum Reading |
Rebuild pump outs with new o-rings |
Rebuild Evacuation valves - new soft parts |
Prelim mass-spec - main vessel and VJ lines, repair as needed |
|
STANDARD REHAB PROCESS
|
|
Remove all panels and doors |
|
Remove all tubing |
|
Remove gauge panels |
|
Rebuild Liquid Level gauges (2) |
|
Diverter valve - Safeties - Burst Discs remove |
|
Re-certify Safeties (3) |
|
Install new drip pans, as required |
|
4" x 4" Structural beams replaced with 1/2" wall thickness (4) |
|
6" x 6" TI Beams, ISO Blocks, 6" x 6" Angles inspected & replaced as needed |
|
Tubing to front gauge removed, and all clamps replaced |
|
Remove gauge panel mounts, install hinge style panel |
|
Fabricate new aluminum panels and doors, provide & install all new hardware |
|
Remove data plates for blast and paint |
|
Blast vessel to industrial finish |
|
VJ and Nitrogen piping sand blasted |
|
Paint - Prime, Base Coat, and Clear Coat |
|
Rebuild Diverter valve with new soft parts |
|
Rebuild all pressure Regulators |
|
Provide new style hinged panel piped with new SS 1/4" flex hoses |
|
Replace pressure gauges as needed, rebuild liquid level gauges and install
new tubing, inspect gauge valves and replace as needed |
|
Clean purge panel, inspect valves and replace as need |
|
Move horizontal lift plates to vertical |
|
Rebuild all process piping valves with new soft parts |
|
Re-install nitrogen piping, new burst disc and re-certify safeties |
|
Remove nitrogen float can, clean and mass spec. repair as needed. Install
new safeties |
|
Reinstall diverter valve, safeties, new burst discs, vent stack |
|
Mass spec repairs |
|
Pump time as needed, main vessel and VJ to <10 microns |
|
Warm retention test 72 hour retention not to exceed 25 microns |
|
Vacuum logs for main tank and VJ lines |
|
Install brass no spark 3" flapper on stack |
|
Clean and install purge tubing, all new u-bolts and clamps |
|
Paint valve handles |
|
Provide & install new valve ID tags |
|
Install new panels and doors after paint |
|
New document holders |
|
Install decals (customer supplied) |
|
Reinstall data plates |
|
CSC Inspection |
|
Pressure Tes |
|
ISO Dimension check per ISO standard 668 |
| |
|
2 ½ UN PORTABLE TANK INSPECTION and/or CSC INSPECTION
|
Visual inspection per
CRM-DIS-002 Visual |
Safety re-certification |
Pressure Test Per
CRM-DIS-002 Pressure |
CSC Third Party Inspection |
Install Decals |